Главная
Study mode:
on
1
Mod-01 Lec-01 Layout of ports
2
Mod-01 Lec-02 Continuation of layout of ports
3
Mod-01 Lec-03 Visakhapatnam port
4
Mod-01 Lec-04 Ships and size of ships
5
Mod-01 Lec-05 Port planning
6
Mod-01 Lec-06 Harbour layout
7
Mod-02 Lec-07 Site characteristics & navigation channel
8
Mod-02 Lec-08 Bathymetric survey
9
Mod-02 Lec-09 Tide, surge, tsunami and wave
10
Mod-02 Lec-10 Wave rose diagram
11
Mod-03 Lec-11 Breakwater
12
Mod-03 Lec-12 Design of breakwater --part-1
13
Mod-03 Lec-13 Design of breakwater --part-2
14
Mod-03 Lec-14 Berm breakwater
15
Mod-03 Lec-15 Dredging & methods of disposal
16
Mod-04 Lec-16 Berthing structures modelling
17
Mod-04 Lec-17 Berthing structures --analyses
18
Mod-04 Lec-18 Loads
19
Mod-04 Lec-19 Types of berthing structures
20
M0d-04 Lec-20 Design of berthing , structures-1
21
Mod-04 Lec-21 Design of offshore berthing , structures-1
22
Mod-04 Lec-22 Estimation of mooring, berthing and seismic forces
23
Mod-04 Lec-23 Estimation seismic forces
24
Mod-4 Lec-24 Active and passive earth pressure and differential water pressure
25
Mod-04 Lec-25 Load combinations and design
26
Mod-04 Lec-26 Fenders
27
Mod-04 Lec-27 Mechanical handling system
28
Mod-05 Lec-28 Single buoy mooring and open sea jetty-part1
29
Mod-05 Lec-29 Single buoy mooring and open sea jetty-part 2
30
Mod-05 Lec-30 Slipway, drydock,floating dock,shiplift
31
Mod-06 Lec-31 Soil structure interaction
32
Mod-06 Lec-32 Calulation of fixity depth
33
Mod-06 Lec-33 Pile load test
34
Mod-06 Lec-34 Ground improvement techniques
35
Mod-06 Lec-35 Analysis of pile with spring support
36
Mod-07 Lec-36 UPV,Half cell potential, Low high Integrity Test
37
Mod-07 Lec-37 Mooring Dolphin at KPT
38
Mod-08 Lec-38 Coastal structures and environmental management
39
Mod-08 Lec-39 BOQ and Cost Estimate
40
Mod-08 Lec-40 Proposed Mega Terminal Chennai
41
Mod-08 Lec-41 Preliminary Project Report on Shipyard
42
Mod-08 Lec-42 Procedures & clearances before implementation of a project
43
Mod-08 Lec-43 Detailed project report
44
Mod-08 Lec-44 Environmental studies of a project -
45
Mod-09 Lec-45 Design of pile
46
Mod-10 Lec-46 Design and construction of diaphragm wall
47
Mod-11 Lec-47 Emprical relationship between spt and several soil properties
48
Mod-11 Lec-48 Model studies for a deep water port_case study
Description:
COURSE OUTLINE: To make the students understand the basic principles of the design of port and harbor structures. The course will cover wide areas such as vessel types, types of harbors, design of entrance channel, turning circle, breakwaters, berthing structures, fenders, bollards, drydocks, slipways, ship lift and offshore structures like single buoy mooring and open sea jetty. EIA studies like tranquility, shoreline evaluation, dredging, disposal of dredged material, etc will also be discussed. The course is designed to give an understanding of design principles, codal requirements, construction methodology, integrity monitoring, retrofitting and rehabilitation. Case studies on preliminary project report (PPR) and detailed project report (DPR) on greenfield ports and modernization of existing ports will also be presented.

Port and Harbour Structures

NPTEL
Add to list